Pros

  • Self-Learning Platform
  • 35 Contact Hours
  • Interactive Lectures
  • 1 Year of Access
  • Accumulative performance summary

Cons

  • This website does not provide a profile of the instructor

Verdict: GreyCampus is a leading provider of training for working professionals in the areas of Project Management, Big Data, Data Science, Service Management, and Quality Management.

Rating
Price:$

In this post, I have featured GreyCampus Review 2022. 

It is a leading provider of training for working professionals in the areas of Project Management, Big Data, Data Science, Service Management, and Quality Management. 

This online platform transforms careers through skills and certification training. It offers Instructor-led online, Instructor-led classroom, and e-learning courses.

Their growing suite of accredited courses is upgraded continuously to address the career improvement goals of working professionals.

GreyCampus Review 2022: Should You Try It? 

Greycampus Courses Are Divided Into Multiple Categories:

  • Project Management
  • Quality Management
  • Agile and Scrum
  • IT Service Management
  • Information Technology
  • Project Management

GreyCampus’ Project Management provides some certified courses and training.

1- PMP® Certification Training

Arranged with the PMBOK® Guide – 6th Edition, this PMP(Project Management Professional) certification training program comes with a host of learning benefits, including practice tests and in-depth video lectures.

They are offering immersive classroom training, handy live online classes, and fast self-learning; you can choose the learning structure that suits you the best.

All the course alternatives come with the dependability of a PMI Registered Education Provider and are backed with global success rates.

GreyCampus Review With Discount Coupon Codes- PMP Certification Training Course

Course Overview

  • 35 Contact Hour Certificate
  • 3 Simulated Exams
  • 1 Year E-Learning Access
  • Official PMBoK® Guide – Sixth Edition
  • 100% Money-Back Guarantee
  • 99.4% Pass Rate

Description

The traditional classroom coaching and live online training involve, immersive, in-depth reviews of the domains and tasks elaborated within the PMP examination Content online.

The online self-learning variant options, detailed videos, simulated tests, and alternative study aids created by a skilled team of certification holders- this variant is enclosed by default in your registration for the standard classroom coaching and live online coaching.

The syllabus for all the course variants conforms to the Project Management Body of Knowledge (PMBoK) version 6.

  • We recently reviewed the Coach Training Alliance program on Affiliatebay. Want to know if this is the right training program for you? Check out our full review.

The educational program also provides further tasks, knowledge, and skills that are a part of the certification examination.

They conduct further active examination reviews- once every month- for participants of instructor-led coaching variants.

This review session involves a live simulated, take a look at, whereas showing you the how and why behind responsive, every of the two hundred queries.

Contact the appointed coaching organizer after you register to book your seat for one of the sessions.

2- PRINCE2® Foundation Training

In this course, you will learn PRINCE2 Foundation 2017 framework. This training will help professionals obtain knowledge and understand the techniques to clear the PRINCE2 Foundation certification exam.

GreyCampus Review With Discount Coupon Codes- PRINCE2 Foundation Training

Course Overview

  • 2 Days Instructor-led Training
  • PEOPLECERT PRINCE2 Foundation Exam Voucher Included
  • 1 Year E-Learning Access
  • 2 Simulated Exams
  • 100% Money-Back Guarantee

Description

PRINCE2 Foundation certification enhances the essential skills to manage resources and handle risks with efficiency.

The vital principles of PRINCE2 are often applied to come off just about any size and nature.

In this course, you will be introduced to the PRINCE2 principles and words. You may be able to act as an associate degree conversant member of a project management team using the PRINCE2 methodology among a project atmosphere supporting PRINCE2.

3- Microsoft Project Training

It is important to make sure projects are done on time, do not surpass the budget, and are under control.

The most effective way to check the growth of various projects is by learning how to take advantage of Microsoft Project.

Microsoft Project Training of GreyCampus will help you learn all that, and will also disclose relevant knowledge required for you to prepare for and pass the Microsoft Project certification exams.

GreyCampus coupon code

Course Overview

  • 1 Day Instructor-led Training
  • 3 Simulated Exams
  • 16 PMI PDUs
  • 1 Year E-Learning Access
  • 100% Money-Back Guarantee

Description

Microsoft Project is one of the most used programs by executives, project managers, and team members.

With this package designed by Microsoft, project managers can assign multiple tasks from a single tool, such as:

GreyCampus’s coaching can facilitate professionals to manage time, tasks, folks, and resources effectively once after finishing a posh project.

Our coaching can give a comprehensive introduction to the fundamentals of the Microsoft® Project, such as collaboration, submitting timesheets, and tired problems and risks.

Multiple learning pedagogies, together with instructor-led categories, video displays, and alternative learning aids, are utilized in the coaching that helps learners learn by doing, listening, reading, and visualizing.

Quality Management

GreyCampus’ Quality Management provides some certified courses and training.

1- Lean Six Sigma Yellow Belt Training & Certification

Lean Six Sigma Yellow Belt Certification helps knowledgeable about mastering the essential parts of the Lean Six Sigma Methodology.

Through this certification, you get a special learn implementation, performance, interpretation, and application of Lean Six Sigma in an exceedingly sure-handed, however collateral method.

GreyCampus Coupon Codes- Lean Six Sigma Yellow Belt TrainingYellow Belt certified professionals can participate as Project team members within the project and thereby facilitate Green and Black Belts to assure the standard of the project.

It’s responsible for driving essential improvement that comes using Lean tools and techniques.

Course Overview

  • 1 Year e-Learning Access
  • Simulated Exams
  • Learning Aids
  • Self-paced: 100 Hours study time
  • Live-online: 115 Hours study time
  • IASSC Exam Optional
  • Classroom: 115 Hours study time
  • 10 PMI PDUs
  • 100% Money-Back Guarantee

2- Lean Six Sigma Green Belt Training & Certification

IASSC Lean Six Sigma Green Belt Certification is the second stage within the Lean Six Sigma certification levels.

The IASSC-CGB (IASSC Certified green Belt) demonstrates the right information of the Lean Six Sigma Methodology that helps to implement quality comes & applications, and Minitab tool for statistical analysis.

GreyCampus Coupon Codes- Lean Six Sigma Green Belt
This course integrates Lean and DMAIC methodologies as outlined by IASSC using case studies and examples that help you to implement, perform, interpret, and apply Lean Six Sigma and a high level of proficiency.

Course Overview

  • 2/4 Days Instructor-led Training
  • 1 Year E-Learning Access
  • 4 Simulated Exams
  • Self-paced: 153 Hours study time
  • Live-online: 171 Hours study time
  • Classroom: 171 Hours study time
  • IASSC Exam (Optional)
  • 100% Money-Back Guarantee
  • Description

The Lean Six Sigma Green Belt course is designed by material consultants to assist participants in preparing and clearing the IASSC-CGB certification test to advance their careers.

The coaching is aligned with the IASSC Green Belt Lean Six alphabetic character Body of Knowledge™ to produce a summary of Lean Six Sigma and covers DMAIC (Define, Measure, Analyze, Improve, and Control). The coaching course is integrated with case studies and Minitab applications.

Who gets recruited through this course?

There is continually an enormous demand for Lean six sigma professionals across industries. Lean six sigma green belts don’t seem to be solely found in producing but additionally in service sectors. 

Professionals with the below-mentioned backgrounds will recruit in this course:

•Engineering or quality supervisory roles
•Management system
•Quality analysis
•Testing
•QMS auditing
•Operations
•Customer service
•Practicing Lean Six Sigma Yellow belts
•Any professional, who desires to create a career as a Lean Six Sigma professional

3- Lean Six Sigma Green & Black Belt Training & Certification Combo

Carefully designed by specialists to organize participants for the Lean Six Sigma Green Belt and Lean Six Sigma Black Belt examination conducted by IASSC (International Association for six sigma Certification).

GreyCampus Coupon Codes- Six Sigma Green Black Belt Training
The IASSC Lean Six Sigma combo coaching by GreyCampus imparts a robust understanding of the Lean ideas, Six Sigma methodologies, and the DMAIC methodology.

You’ll become good with the Lean principles and the tools that enable their productive implementation.

Course Overview

  • 5 Days Instructor-led Training
  • 1 Year E-Learning Access
  • 5 Simulated Exams
  • Self-paced: 290+ Hours study time
  • Live-online: 330+ Hours study time
  • Classroom: 330+ Hours study time
  • IASSC/ASQ exam (optional)
  • 100% Money-Back Guarantee
Description

Participants can get intensive coaching aligned to the universally accepted Lean Six Sigma Body of information as developed by IASSC (CGB and CBB). This can enable participants to arrange for both certifications. 

How do apply for the examination?

The application process for the Greenbelt Lean Six Sigma certified by IASSC-

Eligibility – IASSC doesn’t need any requirement to sit down for the Lean Six Sigma Green Belt examination.

Prepare for the examination – Their LSSGB classroom coaching + LSSGB self-learning package prepares you intensively to pass the IASSC LSSGB exam in one shot. They’ve got a 96.7% pass rate associated with an IASSC authorized coaching organization.

Choose an examination option –

On-Demand Web-Based Certification Testing – Offered to take any time from home or the workplace.

How to apply?

•Purchase an exam voucher.

•Register to the testing system and choose a date and time for your examination.

•Log into the testing system quarter-hour before your examination.

•Your Proctor can take care of the rest, and you’ll be able to specialize in finishing your certification examination merely.

Hardware and System needs

•A laptop with a keyboard and mouse.

•Quiet & calm location at your home or workplace.

•A web camera that will rotate 360 degrees.

•An active, reliable Broadband/High-Speed net connection of a minimum of 4Mbps

•Browser compatibility: Latest versions of Windows net human, Windows Firefox, Windows Chrome, Mac Firefox, Mac Chrome with Java Enabled and Java Runtime, and cookies enabled that comes normal with net browsers.

Agile And Scrum

GreyCampus’ Agile and Scrum provides some certified courses and training.

1- PMI-ACP® Certification Training 

An immersive test-prep course that prepares you for the PMI-ACP certification exam.

This course covers the first recent update (March 2018) to the certification test and is offered in multiple learning formats – self-paced online, online lectures, and in-person classes.

Create your learning expertise conveniently while not compromising on the training outcomes.

GreyCampus - PMI ACP® Certification Training

Course Overview

  • Online Self-learning
  • Live-online classroom schedules
  • Traditional classroom schedules
  • 7-8 hours per day Instructor-led lectures

Description

This coaching program is tackled towards a 360° coverage of the PMI-ACP certification exam. The courseware uses a mixture of practice tests and video presentations for a practical learning experience. All course formats individually accomplish the 21 contact hours education demand for the PMI-ACP exam.

The online self-learning edition of this PMI-ACP course is included by default when you register for the online instructor-led edition or the in-person class version. 

Once you’ve completed their simplified enrollment process, you’ll receive an email confirmation along with your payment receipt on your registered email ID.

You can then access the entire content of the web student portal instantly by logging in to your account on their website. Do you need any help? Please reach them via email ([email protected]) or their online chat system.

2- Certified ScrumMaster® (CSM®) Training and Certification Course

With the certification course Certified ScrumMaster (CSM), you get a complete understanding of the Scrum framework for agile project management.

The Certified ScrumMaster (CSM) is a designation offered by the Scrum Alliance that validates your information in the processes of Scrum methodology.

GreyCampus Coupon Codes- Scrum Master training

Course Overview

  • 2-3 days Instructor-led intensive classroom training
  • Scrum Alliance Membership
  • 2 attempts to take the CSM exam
  • 16 PMI PDUs, applicable if you hold a PMI credential
  • 16 Scrum Education Units (SEU), applicable if you have another Scrum Alliance certificate
  • 1-year access to our PMI-ACP and PMP self-learning courses
Description

The CSM course focuses on providing an improved knowledge of scrum methodologies and their implementation.

The course covers Scrum and Agile summary, scrum values, scrum marketing techniques to stakeholders, etc.

After completion of the course, participants will be able to produce a product vision. This courseware conjointly includes user stories, epics, and themes that create learning effectively.

As a bonus with the CSM course, the members will get a 1-year e-learning access to PMP & PMI-ACP.

IT Service Management

GreyCampus’s IT Service Management provides some certified courses and training.

1- ITIL® 4 Foundation Training & Certification

An immersive examination-prep course that prepares you for the ITIL 4 Foundation exam.

This course covers the first recent update (ITIL 4 – February 2019) of the certification examination and is accessible in multiple learning formats – online self-learning, live-online, and traditional classroom coaching.

Build your learning experience convenient without compromising the educational outcomes.

ITIL Foundation Certification Training

Course Overview

  • Video Presentation covering all topics
  • Practice Questions and Interactive Games to review your knowledge
  • 2 Simulated full-length practice tests
  • Earn 25 PMI PDUs (If you hold a PMI credential)
  • 1 Live-online instructor-led session
Description

This training program is engaged towards a 360° coverage of the ITIL 4 Foundation certification examination.

The tutorial uses a combination of practical tests and video presentations (in addition to instructor-led presentations for lesson formats) to teach learning skills.

ITIL 4 Foundation level provides you with the introduction to ITIL 4 and provides a brand new perspective to appear at the IT Service Management through a Service Price System.

ITIL 4 has been developed for organizations and individuals managing information technology in a trendy service economy.

This update has integrated Agile, DevOps, and Lean ideas with ITIL best practices.

The ITIL 4 Foundation course is obligatory to be eligible for all different levels.

2- ITIL Intermediate Service Transition Training

Are you seeking a career in IT Service Operations? Have you ever completed ITIL-Foundation and aimed to upgrade to intermediate and advanced levels?

GreyCampus is an ATO of PEOPLECERT (Examination Body of ITIL). It offers the simplest of content to equip the seekers with information in IT Service Transition and modify them to qualify in the ITIL-ST Certification examination conducted by PEOPLECERT.

ITIL Intermediate Service Transition Training

Course Overview

  • Instructor-led Training
  • 1 Year E-Learning Access
  • 2 Simulated Exams
  • Learning Aids
  • 100% Money-Back Guarantee
Description

The intermediate service transition course of GrayCampus IICL provides reliable background information necessary to pass the IELL service transition certification exam.

This certificate contains 3 of 17 points to receive ITIL Intermediate certification.
You will learn processes, practice components, and management techniques that facilitate building, testing, and implementing IT merchandise and services. Application of ITIL-ST at entirely different stages of Lifecycle Management underpins strategic and operational choices.

ITIL-ST helps you organize your initial operation for brand new and revised resources created throughout the Strategic and Design stages of the Lifecycle.

Whereas guiding you on techniques for organizing and managing the transition, this certification additionally covers the management of technical concerns, challenges, and risks.

The techniques of ITIL-ST will facilitate organizations and individuals to perceive and manage changes to those services in line with users’ expectations and business strategy.

It plays a crucial role in resiliently managing changes and delivering improvement to services provided by organizations or programs of work.

Information Technology

GreyCampus’ Information Management provides some certified courses and training.

1-Artificial Intelligence (AI) and Machine Learning (ML) Foundation Course

Artificial Intelligence (AI) and Machine Learning (ML) Foundation Course is the brand new edition in the line of EC-Council CEH courses.

The course will lead you right from the starting level to achieve the certification.

They are provided by highly skilled instructors (all of whom are approved EC-Council Instructors, or CEIs), the course picks hands-on demonstration techniques.

GreyCampus Coupon Codes- Artificial Intelligence AI

Course Overview

  • How do machines work?
  • Can machines see the world?
  • Google Photos: Machine with a Vision
  • Understanding Natural Language
  • Learning Complex Games
  • What is Artificial Intelligence (AI)
  • What is Machine Learning (ML)
  • How Machine builds the logic
  • Machine’s Goal: Understanding Loss function
  • The World of Gradient Descent – I
  • The World of Gradient Descent – II
  • Linear Regression Algorithm
  • Quiz: Understanding AI and ML
  • ML Math: Understanding Vector and Matrix
  • What’s Next
Description

CEH (v10) has updated the CEH modules (v9) in many critical aspects of the vulnerability analysis of cybersecurity, IoT devices, attack vectors, and malware. Another focus is on intrusion testing tools.

Throughout the course, you’ll primarily use the identical techniques that the “bad guys” use, together with social engineering practices and even evaluating physical security to achieve access.

Gain information within the methodologies that hackers use to infiltrate networks and devices, i.e., writing virus codes, reverse engineering, etc.

You’ll learn to perform vulnerability analysis to spot security loopholes within the fibers, communication infrastructure, and finish systems.

In addition to the updated modules; there’s additionally the launch of

•The STORM, a mobile security toolkit (Mobile platform attack vector, android vulnerabilities, mobile security pointers, and tools).
•The CEH practical that tests the candidate’s actual skills in applying the ethical Hacking techniques in 20 real-life things.
Please note that GreyCampus is an EC Council-approved coaching Center across North America and uses official EC Council courseware for coaching delivery.

2- Internet of Things-loT 101

GreyCampus presents the Internet of Things-loT 101 online learning course.

Study how loT works, and how to create a fortunate product or company with their course. Realize how the Internet of Things-loT can influence billions of lives across the globe.

GreyCampus Coupon Codes- Internet of Things IoT 101

Course Overview

  • Instructor-led Training
  • 1 Year E-Learning Access
  • Learning Aids
  • Course Completion Certificate
  • 100% Money-Back Guarantee

Internet of Things as a nonsensicality has caught the eye of all of us. This course can facilitate your adequate gain information on the web of Things.

You’ll be able to perceive the potential of the net of Things for our society, in terms of impact on the lives of billions of individuals and on the world economy.

You will additionally perceive the underlying technology that powers the Internet of Things, moreover as the challenges that include such technologies.

We’ll explore several real-life samples of IoT devices that are commercially accessible, and you’ll have a glimpse of the future of the net of Things.

Pros & Cons: GreyCampus Review

Pros

Self-Learning Platform: One of GreyCampus’s best options is the well-organized content that will be used for the freelance study. Study materials and queries are sorted by data space and observe group, permitting students to focus their attention on areas that provide the best difficulty.

GreyCampus’s course monitors progress and provides an accumulative performance summary. Students also are given access to a PM Toolkit that has resources utilized by Project Managers similarly as quite five hundred flashcards.

35 Contact Hours: The Online Self-Learning PMP preparation course will cover the 35 contact hours demand that students would like to use and sit for the PMP examination, awarding people who pass with a certificate as proof.

Each of the self-learning and live instruction choices include these contact hours, which means that students would require no further education to take the examination after concluding any GreyCampus PMP preparation course.

Interactive Lectures: As a part of their online Self-Learning package, GreyCampus includes many hours of informative video lectures.

These usually contain a certified educator speaking with a slideshow visual aid and a live transcript along the right-hand aspect.

Students have the choice to pause, rewind, or skip bound lines and slides in every lecture, with A level of interaction that rivals that of a live educator.

1 Year of Access: With one year of access to the course, students have lots of time to study and learn the fabric.

This is often particularly useful for college students who end the course and take their PMP examination with time to spare since they will access these same learning materials to brush up on pure concepts. This access additionally applies to students who decide on the live educator packages.

Cons

Simulated Exams: GreyCampus provides three mock exams in their PMP review course.

For the overwhelming majority of scholars, this could be enough material for them to become more leisurely with the exam-taking method and indurate the real factor while not wasting an excellent deal of your time.

However, the shortage of over three simulations and the exclusion of customizable simulations is unsatisfying since competitive educational providers do give these amenities.

Customer Support: The GreyCampus provides chat, phone, and email support on prime of a 30-day educator helpline for responsive specific queries in an exceedingly one-on-one setting.

Whereas the trainer helpline could be a convenient and high-quality feature, customer support is unsatisfactory. It has led to several complaints left online from annoyed students attempting to resolve problems.

GreyCampus User Reviews & Testimonials  

Testimonials - GreyCampus Reviews

Quick Links:

FAQs

👍What courses does GreyCampus offer ?

GreyCampus offers many courses categorized in online and classroom. Classroom courses and Online Courses both have -Project Management, Quality Management, and ITIL.

❓Which training mode should I opt for?

If you prefer Self-study and are busy with work would like to study anytime from anywhere then you should opt for online study. If you prefer instructor-led training sessions and have 2-4 days for attending training sessions you may go with Classroom Study.

👑How will the certificate reach me ?

The students who have taken online study will get the soft copy on their email and one who has opted for classroom study will get the hard copy.

$$ What are the payment modes available for GreyCampus ?

Payment modes for GreyCampus are Visa, debit/credit card, American Express, and Diners Club card, Master Card or PayPal.

Conclusion: GreyCampus Review 2022

GreyCampus offers many choices for learning for the PMP examination, as well as live classroom, live online, and an on-demand course.

This makes them decent appropriate students who are operating full-time whereas attempting to study.

By looking at their online self-study program, it is clear that GrayCampus is committed to providing high-quality education to college students easily and efficiently.

Having access to the course for 12 months may be a nice perk, however with solely 30 days of helpline access, you will have to organize your study time consequently.

Moreover, problems with customer support are unfortunately to be expected and will be planned for if any issues arise, which will necessitate contacting them.

However, students should realize their results when taking GreyCampus’s PMP preparation course.

Schilling Arden

Schilling Arden is a quick learner with a curious mind. He aims to educate the people about the most popular learning platforms which they can use to improve their skills. This motivated him to create TSN Digital Marketing , where he has put out all the data that would surely help you find everything there is to know about online learning platforms.

Leave a Comment